{"id":5498,"date":"2021-07-02T10:45:29","date_gmt":"2021-07-02T08:45:29","guid":{"rendered":"https:\/\/arema.com\/?p=5498"},"modified":"2021-07-02T10:45:29","modified_gmt":"2021-07-02T08:45:29","slug":"arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir","status":"publish","type":"post","link":"https:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/","title":{"rendered":"AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Last June, Ens d&#8217;Abastament d&#8217;Aig\u00fces Ter-Llobregat (ATL) awarded the AREMA &#8211; RUBAU joint venture the contract for the execution of the works to upgrade the Corbera PC 15.7 reservoir.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The contract is for the construction of a new 4,000 m3 regulation reservoir, located on a plot next to the existing reservoir on the road that runs through the Bosc de Malhivern, between the Mas d&#8217;en Puis development and the summit of Puig de l&#8217;\u00c0liga, in the municipality of Corbera de Llobregat.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Corbera de Llobregat is currently supplied from a 1000m3 tank located at an elevation of 193.0 m, which is fed by the Llobregat Water Treatment Plant. The demographic growth of the municipality in recent years has made it necessary to improve the supply system, since the insufficient capacity of the current reservoir does not guarantee a 24-hour supply to the entire population in the event of a breakdown or maintenance. The new reservoir has been designed in order to meet this need and increase the current regulation capacity.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This is the third contract awarded to AREMA since the Rubau Group acquired the company in October last year. Last February, the ACA awarded the AREMA &#8211; CICLAGUA joint venture the contract for the operation, conservation and maintenance of the Vila-Seca\/Salou composting plant. This plant has a treatment capacity of 23,000 tonnes\/year and receives dewatered sludge from the facilities in Vila-Seca\/Salou, Cubelles-Cunit, Tortosa, Calafell, Altafulla, Valls, La Pobla de Mafumet and Deltebre, among others. We are therefore in a position to say that, in less than six months, AREMA has become one of the RUBAU GROUP&#8217;s key companies.\u00a0 <\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Last June, Ens d&#8217;Abastament d&#8217;Aig\u00fces Ter-Llobregat (ATL) awarded the AREMA &#8211; RUBAU joint venture the contract for the execution of the works to upgrade the Corbera PC 15.7 reservoir.\u00a0 The contract is for the construction of a new 4,000 m3 regulation reservoir, located on a&#8230;<\/p>\n","protected":false},"author":2,"featured_media":5494,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[38],"tags":[],"class_list":["post-5498","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR - Arema<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR - Arema\" \/>\n<meta property=\"og:description\" content=\"Last June, Ens d&#8217;Abastament d&#8217;Aig\u00fces Ter-Llobregat (ATL) awarded the AREMA &#8211; RUBAU joint venture the contract for the execution of the works to upgrade the Corbera PC 15.7 reservoir.\u00a0 The contract is for the construction of a new 4,000 m3 regulation reservoir, located on a...\" \/>\n<meta property=\"og:url\" content=\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/\" \/>\n<meta property=\"og:site_name\" content=\"Arema\" \/>\n<meta property=\"article:published_time\" content=\"2021-07-02T08:45:29+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/arema.com\/wp-content\/uploads\/2021\/07\/Deposito-Corbera.png\" \/>\n\t<meta property=\"og:image:width\" content=\"539\" \/>\n\t<meta property=\"og:image:height\" content=\"448\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"AREMA - RUBAU\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"AREMA - RUBAU\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#article\",\"isPartOf\":{\"@id\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/\"},\"author\":{\"name\":\"AREMA - RUBAU\",\"@id\":\"http:\/\/arema.com\/#\/schema\/person\/1119419fb94302c8ee456dbb8a0c725f\"},\"headline\":\"AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR\",\"datePublished\":\"2021-07-02T08:45:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/\"},\"wordCount\":284,\"commentCount\":0,\"image\":{\"@id\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/arema.com\/wp-content\/uploads\/2021\/07\/Deposito-Corbera.png\",\"articleSection\":[\"NEWS\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/\",\"url\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/\",\"name\":\"AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR - Arema\",\"isPartOf\":{\"@id\":\"http:\/\/arema.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#primaryimage\"},\"image\":{\"@id\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/arema.com\/wp-content\/uploads\/2021\/07\/Deposito-Corbera.png\",\"datePublished\":\"2021-07-02T08:45:29+00:00\",\"author\":{\"@id\":\"http:\/\/arema.com\/#\/schema\/person\/1119419fb94302c8ee456dbb8a0c725f\"},\"breadcrumb\":{\"@id\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#primaryimage\",\"url\":\"https:\/\/arema.com\/wp-content\/uploads\/2021\/07\/Deposito-Corbera.png\",\"contentUrl\":\"https:\/\/arema.com\/wp-content\/uploads\/2021\/07\/Deposito-Corbera.png\",\"width\":539,\"height\":448,\"caption\":\"Dep\u00f3sito Corbera. UTE AREMA RUBAU\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inici\",\"item\":\"https:\/\/arema.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\/\/arema.com\/#website\",\"url\":\"http:\/\/arema.com\/\",\"name\":\"Arema\",\"description\":\"Agua, residuos y medio ambiente\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\/\/arema.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"http:\/\/arema.com\/#\/schema\/person\/1119419fb94302c8ee456dbb8a0c725f\",\"name\":\"AREMA - RUBAU\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/b021abf70e4f6f397fcc5c00fd63f82678f67ddc6ecf6837f7205ef9a8789856?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b021abf70e4f6f397fcc5c00fd63f82678f67ddc6ecf6837f7205ef9a8789856?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b021abf70e4f6f397fcc5c00fd63f82678f67ddc6ecf6837f7205ef9a8789856?s=96&d=mm&r=g\",\"caption\":\"AREMA - RUBAU\"},\"url\":\"https:\/\/arema.com\/en\/author\/arema-rubau\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR - Arema","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/","og_locale":"en_US","og_type":"article","og_title":"AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR - Arema","og_description":"Last June, Ens d&#8217;Abastament d&#8217;Aig\u00fces Ter-Llobregat (ATL) awarded the AREMA &#8211; RUBAU joint venture the contract for the execution of the works to upgrade the Corbera PC 15.7 reservoir.\u00a0 The contract is for the construction of a new 4,000 m3 regulation reservoir, located on a...","og_url":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/","og_site_name":"Arema","article_published_time":"2021-07-02T08:45:29+00:00","og_image":[{"width":539,"height":448,"url":"http:\/\/arema.com\/wp-content\/uploads\/2021\/07\/Deposito-Corbera.png","type":"image\/png"}],"author":"AREMA - RUBAU","twitter_card":"summary_large_image","twitter_misc":{"Written by":"AREMA - RUBAU","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#article","isPartOf":{"@id":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/"},"author":{"name":"AREMA - RUBAU","@id":"http:\/\/arema.com\/#\/schema\/person\/1119419fb94302c8ee456dbb8a0c725f"},"headline":"AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR","datePublished":"2021-07-02T08:45:29+00:00","mainEntityOfPage":{"@id":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/"},"wordCount":284,"commentCount":0,"image":{"@id":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#primaryimage"},"thumbnailUrl":"https:\/\/arema.com\/wp-content\/uploads\/2021\/07\/Deposito-Corbera.png","articleSection":["NEWS"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#respond"]}]},{"@type":"WebPage","@id":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/","url":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/","name":"AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR - Arema","isPartOf":{"@id":"http:\/\/arema.com\/#website"},"primaryImageOfPage":{"@id":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#primaryimage"},"image":{"@id":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#primaryimage"},"thumbnailUrl":"https:\/\/arema.com\/wp-content\/uploads\/2021\/07\/Deposito-Corbera.png","datePublished":"2021-07-02T08:45:29+00:00","author":{"@id":"http:\/\/arema.com\/#\/schema\/person\/1119419fb94302c8ee456dbb8a0c725f"},"breadcrumb":{"@id":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#primaryimage","url":"https:\/\/arema.com\/wp-content\/uploads\/2021\/07\/Deposito-Corbera.png","contentUrl":"https:\/\/arema.com\/wp-content\/uploads\/2021\/07\/Deposito-Corbera.png","width":539,"height":448,"caption":"Dep\u00f3sito Corbera. UTE AREMA RUBAU"},{"@type":"BreadcrumbList","@id":"http:\/\/arema.com\/en\/2021\/07\/02\/arema-and-rubau-are-awarded-the-contract-for-the-new-corbera-reservoir\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inici","item":"https:\/\/arema.com\/en\/"},{"@type":"ListItem","position":2,"name":"AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR"}]},{"@type":"WebSite","@id":"http:\/\/arema.com\/#website","url":"http:\/\/arema.com\/","name":"Arema","description":"Agua, residuos y medio ambiente","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/arema.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"http:\/\/arema.com\/#\/schema\/person\/1119419fb94302c8ee456dbb8a0c725f","name":"AREMA - RUBAU","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b021abf70e4f6f397fcc5c00fd63f82678f67ddc6ecf6837f7205ef9a8789856?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b021abf70e4f6f397fcc5c00fd63f82678f67ddc6ecf6837f7205ef9a8789856?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b021abf70e4f6f397fcc5c00fd63f82678f67ddc6ecf6837f7205ef9a8789856?s=96&d=mm&r=g","caption":"AREMA - RUBAU"},"url":"https:\/\/arema.com\/en\/author\/arema-rubau\/"}]}},"_links":{"self":[{"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/posts\/5498","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/comments?post=5498"}],"version-history":[{"count":1,"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/posts\/5498\/revisions"}],"predecessor-version":[{"id":5499,"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/posts\/5498\/revisions\/5499"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/media\/5494"}],"wp:attachment":[{"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/media?parent=5498"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/categories?post=5498"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arema.com\/en\/wp-json\/wp\/v2\/tags?post=5498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}